
STANDARD FLUE INSTALLATION
INSTALLATION
INSTALLATION INSTRUCTIONS
STANDARD FLUE INSTALLATION
8 718 682 335b (09.2008)
11
NOTE: to ease assembly of the flue components,
grease seals lightly with the solvent-free grease
supplied.
Check all the seals are seated properly in the grooves
provided and are in good condition.
All flue joints must be sealed to prevent leakage of
condensate and flue products.
Installing the standard flue:
1
Set the flue terminal (B) to the distance
required, secure with screw and seal joint
with the aluminium tape supplied.
2
Slide the inner wall seal (C) onto the
terminal (B) as shown.
If fitting from inside the building; slide
the outer wall seal (K) onto terminal (B).
3
Position terminal (B) through the flue
opening in the wall to the outside of the
building by the distance shown.
The flue terminal (B) MUST be fitted
with the 'TOP' uppermost to allow the
correct fit and use of the plume
management system.
If fitting from the outside of the building;
slide the outer wall seal (K) onto terminal
(B) to fit against the outer wall.
4
Roll the boiler into position on the floor
mounting frame.
Position connector (A) with ‘TOP’
uppermost to align with the three holes in
the boiler inner casing (E).
Secure using three hexagonal bolts (F).
5
Push-fit adaptor (G) into elbow (H) until
secured by the clip.
6
Slide adaptor (G) into the inner flue tube
of terminal (B) and push elbow (H) into
flue outlet (J) until secured by the retaining
clips ensuring a good seal is made.
1
TOP
1
1
0
m
m
3
B
K
G
F
H
E
E
G
H
J
C
4
5
6
A
Clip
C
B
A
2
B
A
TOP
TOP
Comentários a estes Manuais