Bosch DVA-12T Manual de Instalação Página 49

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 72
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 48
RAID Subsystem DVA-16K | Installation Manual Subsystem Maintenance | en 49
Bosch Security System F.01U.027.799 | V2 | 2008.08
Fig. 6.9 Installing the BBU Module
4. Once the new BBU is correctly installed into the subsystem, the LED should start flashing
to indicate that BBU is being charged. When the BBU is fully charged, the LED will light
amber constantly.
i
NOTICE!
The life expectancy of a BBU is approximately 500 cycles. Follow the procedures above to
replace an old BBU with a new BBU in order to maintain fault-tolerant subsystem functional-
ities.
Vista de página 48
1 2 ... 44 45 46 47 48 49 50 51 52 53 54 ... 71 72

Comentários a estes Manuais

Sem comentários