Bosch EHP 6-11 LW Guia de Instalação Página 73

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 80
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 72
73
FOR THE INSTALLER
Commissioning report
Checks on concentrations carried out (collector hose and heating side) .....................................................................................................
Functional test carried out
Menu settings 1.1, 1.4, 5.2 and 5.4. carried out
The instructions about how to use the heat pump have been sent to the client / to the user
Documentation about the apparatus has been handed over
Date and signature of the installer:
Vista de página 72
1 2 ... 68 69 70 71 72 73 74 75 76 77 78 79 80

Comentários a estes Manuais

Sem comentários