Bosch ZSB 30-2 A Instruções de Operação Página 30

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 80
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 29
30 | Installation
6 720 644 143 (2010/09)
Fitting the filling loop (ZWB)
B Close the isolating valves on the mains water inlet [9]
and the CH return [1] connections.
B Remove the blanking plugs [2].
B Place the filter [7] into the inlet side of the filling loop
[4] ensuring that the filter mesh faces into the filling
loop.
B Fit the filling loop [4] to the mains water inlet [9] and
CH return [1] connections. Ensure that the filling loop
is completely pushed into the stop tabs [6, 3] on both
sides of the filling loop.
B Fit two screws and washers [8] to each of the two
connections [9] and [1]. Do not try to turn the brass
hexagon connectors.
Fig. 23
Filling the heating circuit (ZWB)
B Ensure that all system and boiler drain points are
closed.
B Tigthen screw [1] on the filling loop as far as it will go
(Æ Fig. 24).
B Open the cold water supply tap [3] and heating return
tap [2].
B Insert key [4] in the filling direction so the arrow
points to symbol .
B Turn key [4] to position .
B Fully undo screw [1] on the filling loop and fill the
heating circuit to a pressure of 1 - 2 bar.
Fig. 24
B After filling, turn in screw [1] as far as it will go.
1
2
3
6
4
5
7
8
9
1.1
6 720 644 143-26.1O
6 720 644 143-13.1O
1
4
2
3
Vista de página 29
1 2 ... 25 26 27 28 29 30 31 32 33 34 35 ... 79 80

Comentários a estes Manuais

Sem comentários